Copper One completes first hole in Majuba Hill Phase 2 drilling program
Bitget2026/10/30 23:50- Copper One Resources completed MHB-39, the first hole of its Phase 2 drilling program at the Majuba Hill copper-silver-gold project in Nevada.
- The hole reached 1,460 feet, exceeding its planned maximum depth of 1,250 feet as persistent silicification prompted an extension.
- Native copper and copper oxides were visually identified in the hole; laboratory confirmation is required to establish metal concentrations.
- The Phase 2 program covers up to 10,000 feet of drilling to support a maiden mineral resource estimate.
- Assay results from the completed 2026 Phase 1 drilling program remain pending.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
AI-driven selloff boosts safe-haven demand; yen and Swiss franc lead major currencies as the US dollar declines
On Friday, as concerns grew over the sustainability of the AI frenzy, both the Japanese yen and the Swiss franc rose 0.6% against the US dollar, with the yen set to record its largest single-day gain in nearly a month. Analysts noted that when the market shifts toward risk aversion, unwinding of yen carry trades tends to strengthen the yen, while the Swiss franc has long served as a balance sheet hedging tool at the institutional level.

S&P 500 Index falls below 7,000 points

